|
Written by Alex Ynema
|
|
Thursday, 18 March 2010 13:02 |
|
TECHNICAL DATA
- Dimensions 20m x 6.9mtr (main hull bolt section to 11.5mtr breakdown for shipping)
- Dredging depth 9.7m without adaptor at 45 deg (13.7 with adaptor section)
- Spuds Main travelling, both hydraulic11mtr standard (adaptor extensions as required)
- Dredge pump Submerged Warman ladder pump (hydraulic drive)
- Main engine Caterpillar V12 465Kw Marinised cooling
- Cutter swing Swing booms with anchors
- Assembled wet weight 80 tonne loaded and equipped
- Free flowing sand dredging capacity 80ltrs/sec sand at 30%
- Bucket wheel upgraded current design, with H/M replaceable teeth
Layout
- Main body of barge in two sections bolted centreline forward central ladder assembly and lift boom, aft bolted two spud pontoons, mid side pontoons and fwd side pontoons.
- Wheelhouse and engine room aft (engine room insulated) silenced.
- 240 and 440 v generator fitted with welding cycle (Millar USA silenced)
- All hydraulics upgraded mains to 60mm full flow, additional cooling and system capacity with pressure and return filtrations
CONSTRUCTION:
- Builder: Neumann Contractors
- Place: Currumbin (Qld Australia) finish Kwinana, West Australia
- Refit 2005 - 2006
- Design: Neumann Contractors
- Material: Steel treated
- Chine: Hard
- Keel: 50 x 6 FB’s
- Shell: 6mm P/L + 10mm P/L with localised reinforcements
- Frames: 50 x 6 FBS
- Beams: 200 x 75 PFC Longitudinal in AFT Section
- Stringers: 50 x 6 FB’s
- Deck: 6pl and localised reinforcements
- S/Structure: AFT WHS & E/R on Deck aft
- Windows: Aluminium Framed Safety Plate Glass
- Double glazed between E/Rm and W/Hs.
- W/T Bulkheads: 4 incorporated
- Fuel: Approx - 10,000 Ltrs - 2 x 5000 L tanks
- F/Water: Nil (containers loose) - Desalination
MACHINERY:
- Main Engine: Caterpillar 3412-TA (Marinised cooling) S/No - 60M01824
- Hrs – rebuild current (NIL)
- Gearbox: 1 x 3 way Twindisc hydraulic drive
- Steering Gear: Nil
- Refrigeration: Nil
- Shaft: Nil
- Propeller: Nil
- Exhaust: Dry Lagged
- Other: Advance Hyd cylinder for spud. (Marinised)
- Engine water-jacket cooled through submersed cooler - exchanger.
RIGGING/MOORING:
- Mast: Navigation Lights
- Boom: Anchor boom port and stbd aft.
- Ladder Lift boom forward with sheave reduction
- Ladder assembly, pinned forward of cabin
- Hydraulic Drives: Ladder pump drive 2 x Rexroth AVLO11190
- 190cc per revolution
- Bucket wheel drive 2 x A10V71
- Winch circuit drive 1 x A10V28
- Pilot and lube pumps, HP and return filters
- Hydraulic Lines: Hard and reinforced flexible lines, lines in good condition, end connections of flexible piping Denso tape all fittings (flex hoses refitted)
- Winches: 5 winch assemblies driven by Kayaba hydraulic motor model H-95EWE-3
- 3 winches of deck forward of WHS 2 port and starboard midships
- (Ladder lift winch with locking pin)
- All winches with full spool of wire rope (new) Galvanised wire cable
- Anchors: Blast and treated 500kg
- Spud leg drive (new lift chains )
- Pump: Ladder pump WARMAN - G (gravel) 250mm 300mm Discharge
- Oil endcaps, submersible bearing assembly improved water seals.
- Pump driven by single hydraulic motor drive 500CC Rexroth
- Cutter: Bucket wheel cutter with g’box and single hydraulic drive (50mm steel lines new)
LIFE SAVING APPLIANCES:
- Life vests, Fire Extinguishers, Flares, Lifebuoys, Epirb
ACCESSORIES:
- Accommodation Details: From Forward Cabin upper bunk room and lockers
- Bucket cutter wheel, ladder pump, ladder lift boom, ladder assembly, deck winches,
- Wheelhouse, Engine room.
- Including 2 forward wing pontoons and 2 aft spud pontoons.
- Main barge is made up of two longitudinal pontoons bolted together along centre.
- Wheelhouse contains various controls including:
- Engine speed
- Engine room temperature
- Engine rpm
- Inverter volts/amps
- Auxiliary spud control
- Main spud control
- Ladder control
- Slide control
- Tension control
- Production slew control
- Winch/cylinder hydraulic pressure
- Bucket wheel hydraulic pressure
- Ladder pump hydraulic pressure
- Slurry pressure
- Bucket wheel speed
- Ladder pump speed
- Winch speed control
- Various other gauges
- Wheelhouse also contained:
- 240V AC switchboard
- 1800i Inverter (true sine wave) 1800 watts
- Murphy shut down protection for engine
- Oil pollution plan (current spill kit on board)
- Safety equipment list
- Hydraulic ventilation fans
- Engine room ventilated with hydraulic fan. Noise insulation covered with perforated steel on walls and roof.
- Heat detection probe in engine room, clipsal 1239H series.
- Magnetic flow meter (Fischer) 300mm
Hull Internal:
- Various port and starboard voids treated.
- Aft starboard void inspected to sight aft corner deck to side shell welds.
- Welds intact with no visible corrosion or detriments.
- Other voids not inspected sealed (all in current treatments)
- Thorough rust resistant coating in voids inspected.
Hull External:
- Non slip deck.
- Painted externally.
- Anodes in various places around hull were all replaced.
- Most external areas have just been treated and repainted non slip decks redone (colour grey).
- Cables, shackles, pins and sleeves S/S replaced and treated
- Fitted main aft Hyd winch 4000kg with fairleads and snatch points
- Lockers (deck) 2 x midships Port and Aft Stbd (ropes, buoys, anchors slings and spares)
- Set “Stevi” and “Danforth” anchors with 25mm and 30mm rope
- H/P washdown pump (portable) 240v with hoses.
Survey: - (licensed) Fremantle West Australia current 2D
|
|
Last Updated on Saturday, 27 March 2010 20:47 |